1/10
                Site List
                 
                General
                All materials and equipments to be used, shall be in accordance with the international norms
                like CE etc according to the subject or to the relevant Turkish standarts and specifications.
                
                Building System
                Reinforced concrete system whose ground survey ,if necessary strengthening thefloor, has been done
                 in accordance with the latest earthquake regulations and it has also spread footing and pan slab
                
                Facade
                Reinforced concrete and brick or aerated concrete block, jacketing system with mineral wool boards 
                or expanded polystyrene on the building elements of external wall in accordance with the project 
                and decorative housepaint or insulated concrete precast panel wall system..
             
            
                2/10
                Site List
                 
				Frame
                Heat and insulated roof terrace.
                
                Dividing Walls
                Plasterboard wall systems that is in accordance with the reinforced concrete and
                brick and aerated concrete block wall.
                
                Floor Covering
                In accordance with the project saloon and the rooms are laminated flooring, WC and bathrooms
                and the balconies are first quality ceramic veneer (with a suitable plinth) 
             
            
                3/10
                Site List
                 
				Wall Covering
                Important wallpaper on the satin gypsum plaster on the interior walls.Ceramic on the walls of
                 wet areas such as bathroom and WC , and imported wallpaper  in accordance with the project.
                Ceiling Covering
                Waterbase paint and satin gypsum plaster on the ceiling of gypsum board suspended
                 ceiling in all moisture resistant places.
                
                Cephe doğramaları
                Isı ve ses izolasyonlu alüminyum veya PVC (Rehau vb. marka)  doğramalar, projesine
                uygun olarak temperli, lamine veya düz olmak üzere ısı ve güneş kontrollü ısıcam.
             
            
                4/10
                Site List
                 
				Doors
                The indoor doors are laminated on MDF or specialty facing and security external door of the flat.
                Kitchens
                In accordance with the project, acrylic or laminated kitchen top with laminated or
                 lacquer cupboard doors. In accordance with the project stainless steel sinks and wall panels.
                
                Whiteware
                Built-in kitchen appliances (electric stove, dishwasher, refrigerator, microwave oven, in accordance
                 with the project seperated or combined electric oven) kitchen hood in accordance with the project.
             
            
                5/10
                Site List
                 
				Bathroom Cupboard
                In accordance with the project lacquired or laminated cupboards with mirror and acrylic bar.
                Sanitary Ware
                In accordance with the project, hanging toilet bowls with built-in reservoir, acrylic shower trey,
                 tempered glass shower cabins, handbasins in accordance with bathroom furniture, armaturs  in 
                 accordance with the project and accessories.
                
                Wardrobes
                Window frame wardrobes and built-in cloakroom wardrobes in accordance with the flats's interior
                doors in accordance with the project.
             
            
                6/10
                Site List
                 
				Block Common Areas
                in accordance with the project, entrance lobby is veneered by special stone or granite ceramic,
                corridors of the domicile is veneered by granite, ceramic, strairs and landings are veneered by epoxy 
                or natural composite stones, installation aeas are neneered by epoxy or ceramic.
                Lifts
                At the dwelling block, there have been one firefighter lift and hoist, five speedy lifts 
                ( its floor and cabin doors are fully automatic, air conditioned, intercom fittings connected 
                with the security , security alarm, emergeny lights, digital signalization , earthquake sensor),
                at the court block there have been total of seven lifts one of which is passenger lift connected 
                with the floors of car park.
                
                Common Areas of The Site
                In accordance with the project, landscape design which is wooeded and grassed
                sufficiently playground and basketball court.
                
             
            
                7/10
                Site List
                 
				Leisure Centre
                Convertible indoor pool, paddling pool, fitness center, sauna, vapour bath,
                shower-wc, dressing rooms, cafeteria, administration areas, playground.
                Car Parks
                One parking garage for each flat.( Direct transition to the buildings and to the lifts from the garage)
                
                Heating System
                Central heating system which is fully automatic controlled and consisting of highly efficient 
                gas boiler, heat meter system, distribution with the underfloor pipes in the interior of the flat 
                and in accordance with the project panel radiators.
             
            
                8/10
                Site List
                 
				Plumbing System
                24 hours hot water provided by combined type  of heating module with individual billing system.
				Wiring System
                Transformer which belongs to the project and sound-insulated generator automatically actuating at 
                the power of  1/1, leakage current relay which will break the current in case of leakage in residential.
                Private and TSE certified, halogen-free wire harness and electrical equipment.Motion sensor fitted and 
                saving fittings in common  places such as garage, floor halls and stairs, flame retardant, fire-resistant 
                wire harness for security and fire warning systems, earth and conductor system on building basis
                (dogging device).Infrastructure for light fixture and switches and sockets in the number and placement 
                in accordance with the project.
             
            
                9/10
                Site List
                 
				Air Conditioning System Infrastructure
                Multisplit or VRV air conditioning system infrastructure on flat basis In accordance with the
                project(piping, wiring, drainage).
                TV, Telephone, Internet
                In accordance with the protocols to be, setting of fiberoptic cable infrastructure by Turk Telecom
                 to the weak current box inside the residential and within the subscription IPTV, IP or  analogue 
                 telephone, wide band wired/wireless internet access system services, telephone in all halls and rooms, 
                 data and TV -sat line, forty analog broadcast via the two  TV lines supplied by multiswitch, digiturk 
                 and d-smart broadcast via the decoder.
                
             
            
                10/10
                Mahal Listesi
                 
				Security
                Closed circuit camera monitoring and sound recording system for 24 hours, remote entry system and/or
                card entry system to the car parks.Video intercom system connected to the security at the residential.
                Fire Protection
                Pressurized fire escape stairs at the residential block, fire cabinets on each floor,  digital 
                addressed fire warning system and announce system in regard with the necessary supplies at the discretion 
                of the firebrigade at residential and floor halls,  sprinkler fire extinction systems in all venues except 
                for wet areas, firefighters lift, firefighters extinguishing nozzles.
                
                
				ANT CONSTRUCTION reserves the right to make changes in its sole discretion at the phase of project 
                development and implementation.